((ENDUIT-BICOUCHE non 13 18 m2)
 (ENDUIT-EPAIS non 15 25 m2)
 (ENDUIT-HAUTE-ADHERENCE non 140 200 m2)
 (ENDUIT-MONOCOUCHE non 7 10 m2)
 (ENDUIT-MONOCOUCHE-DOUBLE-GRAVILLONNAGE non 11 13 m2)
 (ENDUIT-SANDWICH-GLG non 10 20 m2)
 (BB-0/10-SEMI-GRENU-CLOUTE non 250 320 t)
 (BB-0/10-SEMI-GRENU-CONTINU oui 250 320 t)
 (BB-0/14-SEMI-GRENU-CONTINU non 250 320 t)
 (BB-DISCONTINU-COUCHE-MINCE non 25 35 m2)
 (BB-MODULE-ELEVE non 250 320 t)
 (BB-TRES-MINCE-0/10 non 15 30 m2)
 (BB-TRES-MINCE-0/6 oui 15 30 m2)
 (ENROBE-COULE-A-FROID non 18 30 m2)
 (ENROBE-DRAINANT-BITUME-PUR non 20 26 m2)
 (ENROBE-DRAINANT-LIANT-MODIFIE non 24 38 m2)
 (MICRO-BB-0/6-CLOUTE non 25 40 m2)
 (BB-LIAISON non 210 320 t)
 (BB-RECYCLE-A-FROID non 30 40 m2)
 (BB-THERMOREGENERATION non 30 40 m2)
 (ENROBE-MODULE-ELEVE-1 non 320 400 t)
 (ENROBE-MODULE-ELEVE-2 oui 320 400 t)
 (GRAVE-BITUME-2 non 180 240 t)
 (GRAVE-BITUME-3 oui 180 230 t)
 (GRAVE-NON-TRAITE oui 70 100 t)
 (GRAVE-RECONSTITUEE-HUMIDIFIEE non 40 80 t)
 (GH-RETRAITEMENT non 50 80 t)
 (GRAVE-CENDRES-VOLANTES-CHAUX non 110 110 t)
 (GRAVE-CIMENT non 150 180 t)
 (GRAVE-LAITIER-PREBROYE non 170 180 t)
 (T-Enduit-bicouche oui 12 22 m2)
 (T-Grave-non-traite oui 40 50 t)
 (Relevement-glissiere oui 100 120 m)
 (Bouchage-nids-de-poules oui 300 300 t)
 (T-Scellement-fissures oui 50 50 m)
 (T-Colmatage-fissures oui 50 50 m)
 (T-Reparation-fissures oui 500 500 m)
 (T-Purge oui 500 500 m)
 (T-Reconstruction-locale oui 1000 1000 m)
 (Cloutage oui 6 8 m2)
 (Couche-d-etancheite oui 1 2 m2)
 (Enduit-d-accrochage oui 5 7 m2)
 (Enduit-de-cure oui 6 8 m2)
 (Enrobe-de-reprofilage oui 200 290 t)
 (Geotextile non 1 50 m2)
 (Griffage oui 1 3 m2)
 (Liant-hydrocarbone oui 1 2 m2)
 (Sable-bitume non 1 50 m2)
 (T-Enlevement-couche oui 15 25 m2)
 (T-Fraisage oui 10 20 m2))
